An example of high performance under extreme conditions
Finishing on time; the usage of G3 System in this project allowed meeting the completion date. The pile execution was coincident with jet-grouting operations carried out two meters away. Winning the challenges; There were a set of adverse conditions our technical team had to face on site during the foundation execution such as the 2-3 m tidal variations, salt water intrusions during pile excavation, cement contaminating the slurry from the adjacent jet grouting operations and the constant lowering of the working platform which contributed for the loss of hydraulic head pressure. The G3 system guaranteed pile stabilization and integrity.